Define the interfaces
Review utility requirements, connection points, material specifications, equipment information and site restrictions.
Singapore03 / PROCESS & FACILITY ENGINEERING
Process equipment relies on carefully coordinated infrastructure. We focus on utility distribution, piping and installation interfaces that turn the facility into a working production environment.

Utility infrastructure that connects the facility to the process. Precise routing, considered interfaces and coordinated installation in demanding production environments.
Review utility requirements, connection points, material specifications, equipment information and site restrictions.
Coordinate routing, supports, access and interfaces with the surrounding facility and equipment.
Prepare and install the agreed piping and assemblies to the project drawings and material requirements.
Complete the agreed inspection and testing scope, then coordinate handover with the project team.
The final deliverables are agreed for the project. Typical handover items include:

Yes. BA and EP piping form part of Newzone’s process-system capabilities. Material, finish, connections and installation requirements are confirmed against the project specification.
We can support the agreed utility and facility interfaces. Equipment details, utility schedules, connection points and responsibilities should be established before installation.
The approach is planned around access, service availability and agreed shutdowns. Any isolation, tie-in and return-to-service steps need coordination with the facility team.