Define the acceptance criteria before the handover. We coordinate checks, testing and documentation around the agreed cleanroom and process-system requirements.

AI-generated illustration of 05 / commissioning & certification
NEWZONE / SPECIALIST ENGINEERING

Commissioning & Certification

A structured handover from installed systems to verified performance. Testing and documentation aligned with the agreed project specification.

  • 01

    Cleanroom performance testing coordination

  • 02

    System functional and interface checks

  • 03

    Testing and commissioning programmes

  • 04

    Project handover documentation

From defined requirements to a working installation.

01

Agree the acceptance criteria

Establish the required tests, system boundaries, operating conditions, responsibilities and documentation.

02

Check readiness

Review installation completion, interfaces and prerequisites before the agreed testing activities begin.

03

Coordinate verification

Carry out or coordinate the specified checks and testing with the relevant project parties.

04

Close the handover

Record results, track agreed close-out items and assemble the required handover information.

Make the scope clear. Make the records useful.

The final deliverables are agreed for the project. Typical handover items include:

  • Agreed commissioning scope and records
  • Applicable test results and observations
  • Close-out items and relevant system information
  • Handover documentation within the project scope
Illustrative laboratory cleanroom with glass partitions and utility drops
SCOPE / INSTALLATION / VERIFICATION

A few things to establish early.

Is certification automatic after installation?

No. Verification needs an agreed scope, suitable operating conditions and defined acceptance criteria. The required testing and certification arrangements should be confirmed before the work is commissioned.

Does this cover regulatory or GMP approval?

Regulatory approval and any GMP assessment are separate requirements. This page covers the agreed cleanroom and system verification scope; additional obligations need to be identified with the client and relevant specialists.

Can you help with an existing installation?

Yes. Share the existing system information, current concerns and available test records so the review and verification scope can be defined.

CONNECTED ENGINEERING

01 / CONTROLLED ENVIRONMENTSCleanroom03 / FACILITY INFRASTRUCTUREProcess & Facility EngineeringPROCESS / PIPINGProcess Piping & Utility Systems04 / BUILD-TO-PRINTContract Manufacturing & Off-Site FabricationSECTORS / APPLICATIONSIndustriesSCOPE / DELIVERYProjects

START A CONVERSATION

Let’s define your project.

Share your process requirements, facility plans and intended timeline.

Discuss a Project