NewZoneSingapore

CLEANROOM / NEW CONSTRUCTION

Cleanroom construction.
Built around your process.

Newzone Singapore Pte Ltd is a specialist engineering contractor for cleanroom construction, design coordination and technical fit-outs in semiconductor, electronics and industrial production facilities.

A defined technical package. Coordinated delivery.

For facility owners and main contractors delivering a defined cleanroom package: a new controlled space, production-area conversion or technical fit-out with coordinated architectural and services interfaces.

ISO 7 and ISO 8 environments

Agree the intended process, particle classification, occupancy state and acceptance criteria before fixing the construction scope.

Room envelope and finishes

Coordinate partitions, doors, glazing, ceilings and suitable flooring with equipment routes, maintenance access and people and material flow.

HVAC and filtration interfaces

Coordinate FFU or other filtration arrangements, air supply and return paths, cooling interfaces and pressure relationships with the appointed design team.

Process utilities and equipment

Define connection points, distribution routes, penetrations, supports and responsibilities between the room contractor, facility team and equipment suppliers.

Resolve the constraints before construction.

Classification is one part of the brief

ISO 14644-1 addresses airborne particle classification. Temperature, humidity, pressure relationships, process hazards and operational controls require separate project criteria.

Agree design responsibility

Design coordination does not imply every professional design, QP submission or authority approval is included. Establish appointed specialists, deliverables and statutory responsibilities in the contract.

Check the existing facility

Available electrical capacity, cooling, ventilation, floor loading, access and landlord conditions can affect the layout and scope.

From scope review to handover.

01

Define

Review the process, layout, environmental brief, existing services and programme. Identify information needed for a budgetary assessment.

02

Coordinate

Agree scope boundaries, technical interfaces, design responsibilities and acceptance criteria with the project team.

03

Construct

Sequence enclosure, finishes, services and equipment access around site controls and agreed inspection points.

04

Verify and hand over

Coordinate the specified testing under agreed conditions, record outstanding items and assemble the contracted handover package.

Start with the information you have.

A first enquiry can be brief. Drawings and technical schedules can follow through an agreed transfer method.

  • Location and approximate floor area, ceiling height and available layout
  • Intended process, target ISO class and occupancy state for classification
  • Temperature, humidity and pressure requirements, if known
  • Equipment list, utility schedule and existing facility services
  • New build or space conversion, target programme and site restrictions

Establish the details early.

Who can construct an ISO 7 cleanroom in Singapore?

A contractor should be assessed on its relevant construction scope, design and HVAC coordination, site controls and agreed performance verification. Newzone accepts enquiries for ISO 7 and ISO 8 projects and reviews the facility brief before confirming responsibilities and deliverables.

What information is required to quote a cleanroom?

Provide the location, approximate area and height, process, target class, environmental requirements, layout, equipment utilities and timeline. Existing drawings and service information help identify exclusions and produce a more useful budgetary quotation.

Does ISO 7 prescribe one air-change rate or FFU quantity?

No. ISO 14644-1 classifies airborne particle concentration; it does not set one universal FFU quantity for every ISO 7 room. Airflow and filtration selection depend on the process, loads, room arrangement, contamination sources and agreed performance criteria.

How are cleanroom construction costs determined?

Area alone is insufficient. Enclosure and ceiling details, cooling capacity, filtration, pressure requirements, utilities, existing infrastructure, access, programme and verification scope all affect cost. A budgetary estimate should identify assumptions and exclusions.

Does Newzone provide every design and regulatory submission?

No blanket design or submission service is assumed. The quotation must identify the design team, QP or professional services where required, authority and landlord approvals, testing parties and each contractor’s responsibilities.

FIND YOUR PROJECT SCOPE

What needs to change?

Direct appointments and specialist packages for main contractors, facility teams and equipment integrators.

START A CONVERSATION

Discuss your technical project.

Share the facility, proposed scope, constraints and intended programme.

Request a project review